Aluminium Lift

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT or L/C
Min Order Qty:
-
Supply Capability:
50 Sets Per Month m.t./month
Inquire Now Customer Service
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

Details of Aluminium Lift
Made of high strength stainless steel sleeve mast. High polymer sliding blocks are used between sleeves to ensure close connection
 and flexible movement to improve work stability. GTWY is compact, light, conveniently moved, and also with large working height
and high reliability. It is widely used in indoor and outdoor cleaning activities, such as ceilings, walls, windows, pipelines and exhibition
build-up. It is also good for aerial work in narrow workshop.
 
Specifications of Aluminium Lift: 

Max. working height(m): 16

Travelling when lifts(kg): 8100(12 boom)

Max. lifting torque(kN m): 2062

Boom length: 12~30(standard configuration 18m)

Aluminium Lift Working range: 4~29(outriggers extended)

Aluminium Lift elevation range: 22~77

 

Max. lifting height(mm): 27650 (with 30 boom)

Aluminium Lift Axle base(mm): 2650+1300

Wheel base fromt/rear(mm): 2400/2400

Aluminium Lift Ground clearance(mm):225

Gradeability(%):21

Min. turning diameter(m): 20

GVW(with 12m boom)(kg): 49700

Aluminium Lift Outigger type: H type

Machine dimension(without boom)(L×W×H)(mm): 7460× 3315× 3710

Machine dimension(with 12m boom)(L×W×H)(mm): 17150× 3315× 3710

 
 Aluminium Lift
 Aluminium Lift
Q:What's going on with the decline in construction lift
Check whether the brake contactor and normal, contactor adhesion conditions will decline, brake pads have the problem not only rise to fall, fall in the same slide. If the contactor is ok, you can see that there is a groove on the brake pad, and it is only replaced if the brake is not damaged, such as cracking. If it's a frequency conversion elevator, if you're down, see if the converter has any fault code, if you have a consulting manufacturer. The assumption is that the anchuan frequency converter, which may be a real SE failure, means that the timing error is not normal for controlling the contact of the receiver.
Q:How is the construction elevator installed
Construction elevator installation 1) the location of the elevator depends on the condition of the site and the equipment, so as far as possible, stay away from the overhead line and keep the safe distance specified. When the elevator is running, there is a lot of danger and should be avoided. 2) the order of installation is: 3) place the chassis on the base and the base pre-buried bolt, and the platform is placed on the chassis, and the basket is placed in the middle of the chassis. 4) to install the standard section, each installation of two standard sections (usually less than 8m) to be temporarily fixed. The wire rope shall be used for the use of the temporary cable, and the joints and supporting points shall be bolted and not tied with the lead wire. 5) the installation should alternate between the two columns. Node bolt specification must according to the aperture matching, not packing, found that the aperture position at the time, can not arbitrarily expanding, more can't to lead wire bundle, instead to avoid loose node deformation. 6) when installing the standard section, pay attention to the vertical degree of the guide, and the line of the guide line should not appear in the line of folding and too big clearance to prevent the collision from running. 7) when construction site conditions permit, it can be assembled on the ground and then hoisted on the whole to reduce the height of the work. Due to the design of the frame, the stress condition of the construction is only considered, so before the whole moving up, the counter can be temporarily strengthened to enhance the bending capacity of the nodes.
Q:When does the construction elevator take off?
This is not specific time, it is the contractor's own
Q:What is the need for the sc200/200 construction elevator cable?
General is 3 times 16 + 2 * 6, want to know can seek professional construction lift machine cable market manufacturer ask
Q:The construction of more than many floors must be used for construction elevators
The average height is more than 12 stories. Construction elevators are often called construction elevators, but construction lifts include a broader definition, and construction platforms are part of the construction elevator series. Simple construction elevator is by car, driving mechanism, standard section, attached to the wall, chassis, fence, electrical system and so on several parts, manned cargo construction machinery is a frequently used in construction, because of its unique enclosure structure make it take up both comfort and safety, construction elevator is usually used with tower crane on the construction site, the average load in 1-3 tons, running speed is 1 to 60 m/min. The construction elevator of our country is more and more mature, and gradually goes to the international.
Q:What is the main function of elevator motherboard?
The elevator motherboard is different from each brand, and it functions like a computer motherboard
Q:How does the driver of the construction elevator do the search for a sudden power failure
When the elevator in the operation of the midway stop due to power outages or other reasons, the manual can be decreased, the end of a motor brake electromagnet manual release slowly shake handshandle pull outward, slowly slide down the ladder cage, ladder cage fall shall not exceed the rated speed, manually drop must be conducted by professional maintenance personnel.
Q:The elevator is banned from using elevators for more than a class of high winds
When the wind speed is more than 13 meters per second, the installation and disassembly is forbidden. When the wind speed exceeds 20m/s and the weather, such as hail, the elevator should not be used. This is the norm M/s is about 8, and 13m/s is about 6
Q:Construction elevator positioning should consider which problems
The construction elevator is short for construction. It is an important equipment in high-rise building construction, and construction site accident hazards easily, because it can cause many major accidents, injuries in the inspection should be listed as a key to check the content. Based on past accidents and on-site inspections, we often find topics that we think should be examined in a critical area
Q:Construction site construction elevator and tower crane, which unit security check and acceptance?
Different but most likely is the construction elevator
We are a leading manufacturer of a broad range of disposable medical products and durable medical equipments. From 1993, our American Headquarter, Basic Medical Industries Inc. was set up in California USA exploring our initial business of gloves. Over the past 17 years, we has enjoyed unprecedented growth due in large part to the support of our valued customers.

1. Manufacturer Overview

Location Beijing,China
Year Established 2003
Annual Output Value Below US$1 Million
Main Markets Mid East;Western Europe;North America
Company Certifications ISO9001:2008 Certificate

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shanghai
Export Percentage 1% - 10%
No.of Employees in Trade Department 1000 People
Language Spoken: English;Chinese;Japanese
b)Factory Information  
Factory Size: Above 300,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered;Design Service Offered
Product Price Range Average

Send your message to us

- Self introduction

- Required specifications

- Inquire about price/MOQ

This is not what you are looking for? Post Buying Request