Building Hoist SC200/200 with 50m Height

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
66666666 unit/month
Inquire Now Customer Service
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

Updated CMAX building hoist configuration

 

 

 

Good news that CMAX hoist technology makes great progresses in the last period, which have received warm welcome by the end-users and it is updated CMAX configuration hoist. In order to specially support our long-term potential partners

 

Following advantage for you kind review.

 

1.    Hoist complete cabin and enclosure frame adopt hot dip galvanized process to provide high level rust protection and corrosion protection.

 


(Note: process of acid pickling before hot galvanizing)

 

Before, only the building hoist mast sections are adopted as hot galvanized procession; Updated configuration, not only the mast section, but also the complete cabin and enclosure frame are adopted as hot galvanized procession.

 

Main advantage: improve the outlook and enlarge the complete steel structures usage life by 5~10% increase.

 

2.    Cabin exit door adopts ramping type

 

Main advantage: the ramping door likes a bridge between the building hoist and construction building, which normally increases around USD800 for this improvement.

 

3.    Large anchorage frame is supplied.

 

 

 


吊笼规格

Cage size

L

L1

L2

Update

2500×1500

29003600

1285

1450

 

Normal

2500×1500

18002100

 

Main advantage: the updated configuration increase the tie-in adjustable distance from 1800~2100mm to 2900~3600mm, which normally increases around USD200/piece for this improvement.

 

4.    The side cage produced with aluminum board with increased thickness to 3MM.

 

Main advantage: normally it is 2mm, updated CMAX configuration make the side wall thickness as 3mm to enhance the strengthens and wear resistance of the cabin side wall, moreover, plywood with 6mm thickness and 500mm height is add to the inside wall of the cabin to prevent the damage of the cabin side wall.

 

5.    The floor is produced from 3MM thickness steel riffled boardHot dip galvanized, and 15MM thickness wooden board which can reduce the vibration and deformation a lot.

 

Main advantage: normally there is steel board only, updated CMAX configuration adds one wooden board under the steel board that decrease the noise by at least 50% compared before.

 

6.    Integrated electric control box

                

 

Main advantage: normally the electric box is big and the cable has to go into the electric box for connection purpose; the updated configuration makes the electric box size decrease by 10%.

 

7. For the main mechanic parts, bending plate structure (steel material: Q345B) is adopted, instead of angle steel or channel steel in order to improve the main steel structure’s intensity and the nice appearance.

 

( Note: process of steel board bending)

 

Main advantage: instead of angle or channel steel for main mechanic structure, bending plate steel structure not only makes the steel structure intensity increases by around 20%, but also makes the whole appearance more attractive after painting

 

 

Thanks for choosing CMAX updated configuration building hoist. It is believed that your esteemed company will be more competitive with our qualified products and after-service.

Q:The construction elevator can only go up can't come down what happened
Look at the contactor connectionThe drop contactor does not absorb
Q:What's going on with the decline in construction lift
Check whether the brake work is valid.Check to see if there is any problem with holding the brake.
Q:The construction elevator is commonly used in the process of the project
Basically: completed from the main body - - complete completion
Q:Does the new approach builder need a localizer test report
When the distance of the meter cage is not more than the distance shown in the test, the safety device meets the requirements of the relevant specification. You're talking about a construction elevator that's the kind of gear rack that you don't want to have as long as you want to
Q:Is the construction elevator a special equipment
The construction elevator is a special equipment. Special equipment is related to life safety, greater danger of boilers, pressure vessels (including gas cylinders), pressure pipes, elevators, lifting machinery, passenger ropeway, large-scale amusement facilities and field special motor vehicles (factory) in these eight types of equipment. In order to guarantee the safe operation of the special equipment, the state of all kinds of special equipment, in three stages: from the production, use, the examination has strict rules, is a whole process supervision. According to a 2013-2017 China special equipment inspection testing industry market foresight strategic planning and investment analysis report statistics, by the end of 2011, the national special equipment comprehensive inspection agency has reached 545, including quality inspection department inspection institutions, industry inspection institutions and enterprises self-checking, in addition to type testing institutions, nondestructive testing institutions, cylinder inspection institutions, etc.
Q:Is the elevator detail a construction plan? Do you have a detailed picture of the elevator?
You're talking about the elevator or the elevator shaft, the elevator is the equipment, the elevator manufacturer has the working paper. As for the elevator well according to the data of zxtech figure design, general construction diagram and structure diagram, industry make a steel cylinder or cone steel structure party sometimes out construction diagram, according to the structure of the construction
Q:How long does the construction elevator do a crash test
You don't have to do it now. Go straight to the test center. A site is tested once
Q:What about the energy efficiency of the escalator
Variable frequency construction elevator energy saving effect general. Frequency conversion is not energy efficient. The difference between the frequency and the common machine is the smoothness and speed of the operation. Frequency conversion speeds up to 90m / 1 minutes and the average is only 35m / 1 min Frequency conversion when parking is slow down and stop Ordinary is directly stop delay parking and adjustment made door light who bow Angle decyl with brush spring connection will be better. The frequency conversion requires the site voltage to be strictly a little bit looser than the voltage requirement Energy consumption is: according to the elevator drive mechanism for general three transmission two kinds of the elevator are three 11 kw motor, that their energy consumption are 3 x 11 = 33 kw is hours each hanging basket consumes electricity 33 degrees, the actual power consumption will be bigger.
Q:Why is the construction elevator not up to the roof
The free end of the construction of the lift height is only 7.5 meters high, general construction elevator drive now is the case, so the hoisting cage height and drive around 4.5 meters high, the other national standard construction elevator ceiling limit moves, drive above about 1.8 meters away from the top of the rails. So it's the free end of the construction elevator that can't satisfy the roof. As long as they can set up effective adhesion measures, they can also get on the roof.
Q:What is the height of protecting door protection of construction elevator
Elevator protection door is strict according to the mandatory standard to set up elevator well protection measures for safety technology. The shaft must be set in the range of 1.5 to 1.8, with protective railings or fixed gate and protective railings or fixed doors. 2, elevator well in plus or minus zero layer need to set up the first safety net, every two layers, the upper part of most every 10 m AnQuanPing network design, network security quality must gb5725-1997 "safety net" of standard network, methods must be checked in accordance with the relevant provisions. Installation in the safety net elevator dismantlement, the operator should wear the seat belt according to the regulation. On the floor and roof, a short side hole is larger than 1.5 m, the hole should be set in the requirement of the protective railing, the bottom setting safety net. To set safety warning signs that meet national standards in the elevator shaft. Safety warning signs are clear, warning lights should be set at night. The protective railings and gates shall be marked with yellow and black stripes and shall be manufactured according to the standards of construction safety technical specifications. 5, elevator wellhead protection facilities need to dismantle or change temporarily, and by the project full-time safety sign shall be the responsibility of the project director, and ready to move or change the security countermeasures. To inform all staff at the same time; Recovery after safety facilities must be by the project director, full-time security personnel and other related personnel on-site inspection management, qualified rear can continue to use.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

- Self introduction

- Required specifications

- Inquire about price/MOQ

This is not what you are looking for? Post Buying Request