hydraulic system Excavator SH75X - 3B
- Loading Port:
- Shanghai
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 1 unit/month
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
Specifications
Working Range
Arm length | 1.71 m | 2.12 m |
---|---|---|
A ( Max.digging radius ) | 6520 mm | 6900 mm |
B ( Max.digging depth ) | 4140 mm | 4540 mm |
C ( Max.digging height ) | 7330 mm | 7620 mm |
D ( Max.dumping height ) | 5250 mm | 5540 mm |
E ( Max.vertical wall cut depth ) | 3640 mm | 4100 mm |
F ( Min.front swing radius ) | 1785 mm | 2085 mm |
G ( Rear end swing radius ) | 1235 mm | |
H ( Max.lift above ground ) | 415 mm | |
I ( Min.drop below ground ) | 205 mm |
Dimensions
SH75X-3B | ||
---|---|---|
Arm length | 1.71 m | 2.12 m |
A Overall length | 5915 mm | 5910 mm |
B Length from center of machine (to arm top) | 4492 mm | 4487 mm |
C Length from center of machine (to shoe top) | 1425 mm | |
D Center to center of wheels | 2210 mm | |
E Overall track length | 2845 mm | |
F Overall height | 2900 mm | 2950 mm |
G Clearance height under upper structure | 745 mm | |
H Shoe lug height | 20 mm | |
I Cab height | 2700 mm | |
J Upper structure overall width | 2225 mm | |
K Width from center of machine (left side) | 1065 mm | |
L Width from center of machine (right side) | 1160 mm | |
M Track gauge | 1870 mm | |
N Overall track width with 450 mm 600 mm | 2320 mm 2470 mm | |
O Std.Shoe width | 450 mm | |
P Minimum ground clearance | 360 mm | |
Q Width of blade | 2320 mm | |
R Height of blade | 450 mm |
Principle Specifications
SH75X-3B | ||
---|---|---|
Base | Arm length | 1.71m |
Bucket capacity (ISO heaped) | 0.28m3 | |
Std.operating weight | 7920kg | |
Engine | Make & model | ISUZU AU-4LE2X |
Rated output | 40.0kw/2000 min-1 | |
Displacement | 2179ml(cc) | |
Hydraulic System | Main pump | 2 variable displacement axial piston pumps |
Max. pressure | 29.4Mpa | |
Travel motor | Variable displacement axial piston motor | |
Parking brake type | Mechanical disc brake | |
Swing motor | Fixed displacement axial piston motor | |
Performance | Travel speed | 5.1/3.3km/h |
Drawbar pull | 59kN | |
Grade ability | 70%<35º> | |
Ground pressure | 35 kPa | |
Swing speed | 9.5 min-1 | |
Bucket | 57 kN | |
Arm | 38 kN | |
Others | Fuel tank | 100 liter |
Hydraulic fluid tank | 97 liter |
Standard equipment
Hydraulic system
- High-performance return filter
- One-touch idle
- Changeable 2-speed-travel
- Rotational ABS
Safety equipment
- Rear-view mirror
- Gate lock lever
- Emergency escape hammer
- Seat belt
- Cab-top headlight
- Travel alarm
- Theft prevention dog-chain
- Boom holding valve
- Engine emergency stop switch
Cab/interior equipment
- KAB seat
- Large-size rounded cab
- Fluid mount
- Air conditioner
- Defroster
- Automatic lock for front facing window
- Automatic point wiper connecter
- Intermittent wiper with washer
- Reclining seat
- Cup holder
- Ashtray
- Room lamp
- Hat hook
- AM/FM Radio
Others
- Engine that complies with tear-3 exhaust emissions regulations
- EMS (Easy Maintenance System)
- Long life hydraulic fluid
- Front-face protective net for radiator
- Aluminum radiator
- Aluminum oil cooler
- Tool kit
- Grease gun
- Fuel filter
- Double-element air cleaner
- Q:I am a good mechanic and have a very good experience of dozer and crane excavator maintenance can somebody help me find a good job
- My hubby tried SMC.. its not all that good. Its just a drop shipment membership. You will owe them money when you have not made a dime. Don't do it unless you got the money to spend. At anyrate... you can try USAjobs , try America's job bank, there's a lot of construction jobs about to happen with the stimulus package hitting the states ...they will temporarily start reconstructing and repairing old bridges and streets and etc...
- Q:I need an IC (integrated circuit) with this part number: hb6433308cp.This IC is used in monitors of Komatsu excavators.another question is that if anyone can help me to find the program of this IC.Thanks in advance
- Are you positive about that part number? I can't find it on the Net or in the Allied Electronics catalog. AE usually has just about every IC that exists.
- Q:somebody says that the experimental setup for measuring the speed of the light in Fizo's experiment is the largest machine is that right?
- The largest operating man made machine in the world is the CERN LHC. The Bagger 288 comes in second. Here are the details of both machines for you. The Bagger 288 is the largest digging machine in the world. The bucket-wheeler excavator named Bagger 288 (Excavator 288) is built by the German company Krupp. More specifically, it is a mobile strip mining machine. It is the largest tracked vehicle in the world at 13,500 tons. However, Bagger is powered from an external source and is more correctly described as a mining machine which can be moved, while the crawler-transporter was built as a self-powered, load-carrying vehicle. The Large Hadron Collider (LHC) is the world's largest and highest-energy particle accelerator. It is now the worlds largest operating machine. It is expected that it will address the most fundamental questions of physics, advancing humanity's understanding of the deepest laws of nature. The LHC lies in a tunnel 27 kilometres (17 mi) in circumference, as much as 175 metres (574 ft) beneath the Franco-Swiss border near Geneva, Switzerland. I must make a comment concerning 'Flossie's' answer as balderdash. If he/she had done a little research, telephony or communication networks are a series of massive devices of which includes, computers, servers, satellites and transmission microwave towers, transmission wires, and not just 'one' machine. Just a point of correction. Hope this helps you. Regards, Warren
- Q:When was Troy founded, and by who?
- The Troy I settlement, first discovered by Heinrich Schliemann, sits just above the bedrock, the top of the earth's crust. Therefore archaeologists assume that even though there were people living just a few miles from Troy, no one had decided to build a real town at that exact location until around 2700 BCE. Several older villages near Troy were studied by Schliemann, Carl Blegen and the current excavators. Two of the villages contained real evidence of early human settlement: Hanay Tepe and Kumtepe. Both belong to the period before the Bronze Age, called the Neolithic, or New Stone Age. During the Neolithic farming and pottery-making were in full swing. The practice of religion required some organization, but society was simply ordered compared to the Bronze Age, when the evidence suggests greater (priest, trader, ruler, craftsman, farmer, etc.) and perhaps greater difference between rich and poor. During the Neolithic period chipped stone was used more often for tools than metal. During the Bronze Age, metal tools were used more often. After any catastrophic destruction (earthquake, war, fire, plague) the people of Troy who survived usually rebuilt right away. Survivors, or victors, were in such a big hurry to rebuild that they did not bother to cart away the remains of the destroyed city. They would level things off a little, and just build on top! This explains why, after nearly 2000 years of occupation, the city was built up by about 30 feet. L8r
- Q:My father won an auction on the internet for a really nice excavator that looks too good to be true. The seller wants us to pay him first before he delivers it to us. I was wondering if there was a form of payment similar to escrow, where we transfer the funds, but the seller does not get to access it until the equipment is in our hand and we approve of it.
- I am assuming you bought this on Ebay. Paypal is the online OKorder account that acts as an escrow account. You put the money in, which notifies the seller. The seller delivers the product then can collect the money. If you do not receive the item, you can contact paypal and they take that money right back out of the seller's account. A credit card does exactly the same thing. If you don't get the property, you have 30 to 60 days to contest the charge and get the money right back. Hope this helps.
- Q:Can anyone tell me the Country 92.5 Country Club Drive Code for 2/29/08?
- the codes String is (just cut and paste in all): blajarlinbadturexc .
- Q:i have three questions.the first situation is:person A plays somethingperson B plays an instant in RESPOND to person A's creatureQEUSTION : can person A play a SORCERY in RESPOND to person B's instant?the second question:what is the difference between the LEGEND rule and the PLANESWALKER rule?the third situation:person A plays halimar excavatorperson A then plays a jwari to put it in as a halimarperson B responds to the jwari and plays path to exile(halimar removed)person A plays another jwari in response to path to exilemy assumption is that the last jwari played will come in as a halimar, then the one on the field will be removed due to path to exile. then the first jwari played will come in as a halimar since there is a jwari(halimar) on the field.is this correct since the text of jwari says come in to play as any ally on the battle field? (not targeting any allies on the battlefield)
- First question: No. Until the entire stack resolves, only an instant could be played to respond to player B's response. Second: legend rule destroys permanents with the same name. The planeswalker rule destroys planeswalkers with the same sub-type. For example, Chandra nalaar and Chandra ablaze share the same subtype (planeswalker - CHANDRA). Third: A's first jwari will come into play as a halimar. If B responds to it by exiling halimar, the first jwari will still come in as a copy of halimar. Player A cannot respond to path by playing a creature unless he or she plays the creature after the stack with path resolves. If there is a jwari that copied halimar on the field and A plays another jwari, he or she can copy the jwari to become a second halimar because the first jwari is a copy of an ally, thus it takes on the creature type ally
- Q:My name is Justin Hart and I am a college student studying Robotics and I am working on a project for one of my classes that that will be using tank treads. I am building is a cart that will need to be able to carry up to 600lbs. I also would like it to be able to drive up stairs. The base of my cart will be 36-40 inches long and then in the front of the cart I would like the tread to angle up 35 degrees for 16 inches.
- See if you can use the tracks off of a mini excavator, the are made by almost every company that makes heavy equipment, Caterpillar, Deere,ETC
- Q:What is the meaning of Nanxiang excavator
- Meng Jiangnu learned that her husband was tired of repairing the Great Wall, and his bones were buried in the Great Wall. She didn't see her husband, and at last she was very sad. She shouted at the Great Wall and cried loudly, "which one is better?"!"Sun Wukong was crushed under Five Fingers Group and could not move for 500 years.
- Q:What are the names of the characters on Bob the Builder?
- Bob The Builder Characters
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
Related keywords
You Might Also Like