Steel Frame Formwork for Light Duty Frame Formwork

Ref Price:
$110.00 - 150.00 / m²
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
300 m²
Supply Capability:
80000 m²/month
Inquire Now Customer Service
  • OKorder Service Pledge
  • Quality Product
  • Order Online Tracking
  • Timely Delivery
  • OKorder Financial Service
  • Credit Rating
  • Credit Services
  • Credit Purchasing

Add to My Favorites

Follow us:

1. Structure of Steel Frame Formwork-Light duty frame formwork

Light duty steel frame of this kind is weighing lightly while bearing high capacity and in some sense it will reduce human cost for customers.

 

2. Main Features of light duty steel frame formwork

-Simply assemble and disassemble.

-Film faced plywood used to repeat its use with almost 40 times

-Smooth concrete surface to reduce post processing fees.

-Accessories used effectively(such as nail, steel wire, tie rod..).

-Adjustable sizes (1200 steel frame formwork can be adjusted from minimum300mm to maximum 1050mm)

-Easy to move and remove

-Parts used in column steel frame formwork can be used in wall steel frame formwork

 

3. Light Duty Steel Frame Formwork Images

 

Steel Frame Formwork for Light Duty Frame Formwork

 

Steel Frame Formwork for Light Duty Frame Formwork

 

 

 4. Light Duty Steel Frame Formwork Specifications

Column steel frame formwork sizes

Steel Frame Formwork for Light Duty Frame Formwork

 

5. FAQ of Light Duty Steel Frame Formwork

 

1) What can we do for you? 

    .We can ensure the quality of the Light Duty Steel Frame Formwork and avoid extra expenses for customers.

    .We can provide you the professional technical team.    

    .We can provide professional building proposal for your projects.        

 

2) What promises can be done by us?

   . please feel free to write us for any QUOTE.

   . If need any technical and building assistance, we could provide on-site professional staff for instruction.

   . Please DO check goods when courier knocks your door and contact us asap if any issues.

 

3) What about of our after-sale services?

   . Response will be carried out  in 24hours  after receiving any complain or request.

   . Any formwork cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.

 

 4) What about the package and shipping time?

    .Packing: wood package and adhesive tape

    .Shipping: by sea

     Shipping time: Normally small orders, it just1week business days to arrive your hand; When comes to the customs declaration, it may need 2weeks.

 

 

 

Q:What is the difference between the wheel steel frame and the aluminum frame
Wheel steel frame is also called "hub", the material is divided into two kinds of steel and aluminum alloy, the main difference:1 appearance, aluminum alloy work fine, beautiful, steel to be significantly inferior;2 heat dissipation, good thermal conductivity of aluminum alloy, the heat release of the brake help, steel to some;
Q:PKPM how to add lateral restraint steel frame
Hello,PKPM is not directly added to the argument, the landlord did not express clear
Q:Steel frame wood fire doors and steel doors is a concept
Steel wood fire doors that wood fire doors. The door is made of double layer board, which is coated with a galvanized iron sheet or a double layer wood board with a single side of a gypsum board, and a double layer board and a double layer of asbestos can be used. The new standard fire door fire door provisions of steel wood burning wood or difficult burning wood products making door frame and door frame, door panel, door fire insulation materials filling material is non-toxic and harmless to the human body and steel, and with fire hardware fittings with certain refractory properties of the door. The fire resistance of the fire doors are above 1.2H.
Q:What are the advantages of steel frame structure
Wind resistance: steel structure of light weight, high strength, good overall rigidity, deformation ability. The weight of the building is only 1/5 of the brick and concrete structure, can resist the hurricane of 70 meters per second, so that life and property can be effectively protected.
Q:What is the difference between steel frame and steel frame?
Steel structure and concrete structure, masonry structure, wood structure and so on, to the composition of the material structure.
Q:What are the requirements for the installation and the characteristics of the chimney sliding formwork
Economy: to ensure the quality of the project, safety and duration of the premise, as far as possible to reduce the one-time investment, increase the number of times the template turnover, reduce the use of labor, to achieve civilized construction.
Q:What types of building templates
This template has low price, flexible use, can be assembled into various shapes of the template structure, especially the structure of complex shape, suitable for a wide range of Engineering: second is framed plywood formwork system, the frame and rib small plywood formwork with steel frame for hot rolled flat steel, plate thickness is 6ram
Q:Steel frame wood fire doors are graded? Grade A, B, C?
In 1993 China formally issued and implemented the wooden fire door products -- GB14101-93 standard "wooden fire door general technical conditions", the standard of wooden fire door products classification, size, technical requirements, test method, inspection rules and signs, packaging, transportation and storage of more detailed provisions. Wood fire door is made of wood or wood products as door frame, door frame, door panels, door filled with insulation materials or door with wood or wood products for frame, solid wood doors, according to need can also on the door on the installation of a composite fireproof glass door is arranged above and is composed of a door frame and composite fireproof glass bright window, and with fire hardware accessories which can meet the fire-resistant integrality and heat insulation door. Wood fire door according to the fire resistance limit is divided into class A, B, C three class fire door, the fire performance requirements were 72min, 54min and 36min, for the production of wooden fire door wood to dry and flame retardant treatment, the moisture content should not be greater than
Q:100 tons of light steel frame steel structure connecting plate
The weight of the connecting plate generally accounts for 8% to 12% of the total weight!
Q:Steel frame 5 meters span to the extent of the H beam
Where is it located? You can learn about wind, snow, and earthquakes.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

- Self introduction

- Required specifications

- Inquire about price/MOQ

This is not what you are looking for? Post Buying Request